Investment case
The market is coming. We are already here.
Long-duration storage for the urban environment: TRL 9, ready to release.
Let us talk.Long-duration storage is not a bet. It is physics.
The more intermittent electricity from sun and wind is added, the larger the summer surplus and the winter gap become. Every expert reaches the same conclusion, from the Swissgrid white paper to the industry reference work “Areale und Quartiere”. The National Research Programme “Energy” recommends, verbatim, implementing DMES, and calls for pilot plants.
Recommended in 2020, made legally possible in 2026, built since 2024 by eRevo.
The energy transition does not work without long-duration storage. The market has to come, and regulation is accelerating it: the solar obligation in construction, falling feed-in tariffs and, from 2027, expected negative feed-in prices make storage a mandatory component of every PV installation. Yet while investors crowd into the me-too business of battery storage, a market of displacement, long-duration storage in the urban environment is not yet on the radar. That is precisely the opportunity.
While others research, we deliver.
TRL 9, proven in the field. The world's first building-integrated DMES plant has been running at full load in Eich LU since April 2024. The only large-scale storage system permitted inside an inhabited building. eRevo AG Energy Revolution was the first company in Europe to realise it: first mover in a field that is only just opening up. Ready to release: projects can be implemented now and are economically viable. In ideal configurations, payback periods of under ten years are possible.
The case in figures.
> 1 Mrd. CHF
Market potential DACH, per year. Switzerland: CHF 100 to 160 million per year, researched and robust.
TRL 9
Proven in the field. The world's first plant of its kind, at full load since April 2024.
6 Jahre
A head start. Team, technology and partner ecosystem that nobody copies quickly.
20 %
System architecture margin. Based on an average project volume of CHF 2 million. Asset-light, without capital-intensive production.
2 Anlagen/Jahr
Operational break-even. EBIT-positive from 2029 with a lean cost structure.
Exit
Strategic integration. Outlook: utilities and infrastructure groups.
Why nobody catches up with us.
Energy Intelligence.
AI-supported operations management, anchored in the founding team. Every plant learns, and every new one starts out smarter.
We shape the rules.
SVGW H10001, the safety framework for building-integrated H₂ systems, co-developed by eRevo. Whoever helps write the standard defines the market.
Proven, not claimed.
World premiere in Eich since April 2024. Mandates with Halter, Integral Design Build, GETEC and the Canton of Lucerne.
The window of opportunity
Long-duration storage is not yet on investors' radar. Once it is, today's early pricing will be history.
You will receive the full investment case, with figures, ask and terms, in a direct conversation.
Let us talk. Before the market wakes up.Confidential, not for distribution.